I'm at my wits' end, guys. Please help!
I've got my Flow set up; it's beautiful. It does everything I need except put the data into the spreadsheet at the very end of the Flow.
Whenever I test it or try it outside of a test (I read somewhere that a test run could be the issue), I get a time out and/or Bad Gateway. I have tried everything I can think of, including extending the duration of the timeout, and still nothing is getting the data to the spreadsheet.
To troubleshooting, here's what I suggest you to either provide or look into:
1. Look into see if you are correctly connected to the Excel Table. Ensure that you have a step "Get a row" prior to "Add a Row" step. Once you add "Get a row" and identity which table you want to "Add a Row". By running flow at this point will serve as a checkpoint to ensure that you will be able to utilize output information in to "Add Row".
2. Try to disconnect your "Excel Online" connector and reconnect. Same for other connectors depends how you have your flow setup.
Michael E. Gernaey
497
Super User 2025 Season 1
David_MA
436
Super User 2025 Season 1
Riyaz_riz11
244
Super User 2025 Season 1