Hi all,
I want to build a flow that updates/adds items from a sharepoint list do devops and the other way around.
I already have a devops environment with various chiffres, epics, features and product backlog items. I need all of those items to be synced to a list on sharepoint. Additionally If I will create or update a new item on devops it should be synced with the sharepoint list again. Also the other way around, so if I create a new item on the sharepoint list, it should also be synced to devops. So both ways the sync should be possible.
Thanks in advance
Michael E. Gernaey
497
Super User 2025 Season 2
David_MA
436
Super User 2025 Season 2
Riyaz_riz11
244
Super User 2025 Season 2