Hi all,
I want to build a flow that updates/adds items from a sharepoint list do devops and the other way around.
I already have a devops environment with various chiffres, epics, features and product backlog items. I need all of those items to be synced to a list on sharepoint. Additionally If I will create or update a new item on devops it should be synced with the sharepoint list again. Also the other way around, so if I create a new item on the sharepoint list, it should also be synced to devops. So both ways the sync should be possible.
Thanks in advance

Report
All responses (
Answers (