It is easy to create, and join branches when creating a new flow, but what about when you have an existing flow, and realize that you could optimize it to make run several actions at the same time. Is it possible to create, and join branches for existing flows?
The only way I have found around this, is to create the parallel branches at the very end of the flow, and then little by little move all the existing actions into the new position. Is there a more efficient way to do this?
thanks.