Hi All,
I’m hoping you might be able to help. Is it possible using Flow to do the following;
On transition of an issue within JIRA to status ‘Complete’, a new folder location (matching the unique ID of the JIRA issue) is created within a specific SharePoint directory and then all files which have been uploaded to JIRA are copied and/or pasted from the JIRA issue to its respective folder in SharePoint.
Our IT department have indicated that SharePoint is our approved/supported content management location so I’m trying to figure out a way that the files can be moved automatically from JIRA once an ‘issue’ reaches a specific status.
Thanks in advance for any advise/support.
I have the same question (0)