Hi
I'm completely new to this and would like to use some future dates as a trigger to copy a file in Sharepoint. I managed to setup the end result (copying the file) but I'm lost with setting the dates as a trigger. Since there are several dates, I added them to a table in Excel (Table name = Core) but how do I tell Power Automate to read the dates and use them as a trigger? I guess it would be something like IF the cells of the table = TODAY but I have no clue how to set this up.
