Im using a high frequency flow that I want to execute on demand.
I see that the flow frequency on Plan 1 is 3 minutes vs Plan 2 is 1 minute.
Im running a flow with an Flobot in Teams that posts an Adaptive card with some information.
- Trigger: Enter search trigger search Term in a Teams Message = [Covid 19]
- Action: If Body Text to Teams = [Covid 19] then post Adaptive Card with CDC Info
This flow could be run multiple times simultaneously across our organization.
The flow runs perfectly, I just need it to run on demand.
After the first flow is run, would the next person executing the flow have to wait upto 3 minutes before the flobot would work?
What would be the solution to execute the flow on demand for this flow or other high frequency flows. I mean frequent than even 1 minute apart. In this day of instant info, this is an enternity.
Thank you for the help.