Hi all,
I am running into the following issue.
When I load data for process mining, my timestamps appear to be incorrect. I don't get any error messages when preparing the date, but after saving and analyzing my process, many timestamps are set to 1-1-0001. The strange thing about this is that previously I used the same export format (over the same dataset) and it worked back then. The only thing I have changed are the names of the activities. I've tried everything but can't get it to work.
I use the following format for the timestamps: 'YYYY/MM/DD HH24:MI:SS'
There are a number of printscreens in the attachment.
Do you have a possible solution for this?
I'd love to hear it, thanks in advance!