Hi All, I'm looking to build a calendar with 2 months per page layout as shown in below
and I'm aware powerapps has a screen built-in which give 1 month page layout as shown below
is there a possibility to re-utilize this component and make it to two layout per page ?
@v-qiaqi-msft @WarrenBelz any thoughts here ?

Report
All responses (
Answers (