Hi,
I need to add 7600 items in a Sharepoint list.
In my flow, I use 2 "Apply to each" actions :
- first one gives19 items
- second one gives 400 items
Total items to add is 7600 items =19 * 400
In order to provide the execution speed of the first "for each", I set Concurrency Control to "On" and "Degree of Parallelism" to 20
But the flow duration is 27 minutes.
It seems to be a long duration ... what do you think about ?
