I have a Microsoft list which has 4 date fields (Last Event, Next Event, Second Event & Third Event).
The user populates the list with the last event and then there is a flow which works out what the other dates should be. That all works fine.
My problem is with the other flow connected to this list. This intention of this flow is to 'Add time' to the third event when todays date = next event date. It also needs to move the original third event date to the second event, the second event date to the next event and the next event to the last event (so they all shift along one).
I'm a little stuck on how to create this flow? Any help would be greatly appreciated.
Thanks


Report
All responses (
Answers (