Hi
I have a SharePoint site where the different owners of the project each have their own titles. There is a master RAIDD (Excel spreadsheets) where different people are assigned tasks. I'd like it so the master spreadsheet is updated but then in each of the project areas there is a spreadsheets that shows the tasks for that owner only.
So basically I'd like to update the master spreadsheet, but then the individual tasks be sent to the individuals spreadsheet. There is no need to feedback to the master spreadsheet.
What would be the best way to set this up?

Report
All responses (
Answers (