Hello,
I have an issue with a flow I created to return a calculated column to a Date/time column.
I have in a list two column:

The first column is a calculated column from other columns in the list.
The second column (Next Cal. LAB-A Date) is a Date/time column (I want to use it in the calendar view of the list)
I did the flow and ran it, the problem is that the flow return the date in (Next Cal. LAB-A Date) to the date in the first column but -1 day. (See the shortcut above)

Any idea how to get the same day as it is calculated in the first column? (Or any idea how to get a calculated column return to a date/time column to be able to use it in the calendar view without running a flow).
Thanks a lot for helping me.