Power Platform Community / Forums / Power Automate / SharePoint Calendar Items
Power Automate
Unanswered

SharePoint Calendar Items

(7) ShareShare
ReportReport
Posted on by Microsoft Employee

I got a SharePoint Online (O365) List that is a Calendar to work in a Flow.  I have an approval list that then enters data from the request list into the Calendar list.  When setting up, I used SharePoint - Create Item Flow activity and had to manually type in the List Name once paste in the URL of the SharePoint Online site (10/25/16 confirmed working).

 

However, not all the fields are available - for example, the All Day Event field is missing, but Event Type (used for recurring events, normally a hidden Calendar column) is visible.  As an alternate method, I tried to then create another action of SharePoint - Update Item but the All Day Event field is still missing.

 

The odd thing on Date/Time fields is that I am pulling a Date Only (no Time) from a SharePoint List submission and then using that as the Date entry in a SharePoint Calendar (once the Flow is approved).  The Date Only comes into the Calendar List as Date at 12:00 AM (midnight).  So when using a Date Range of 3 days, it comes into the calendar as Midnight of Day 1 to Midnight of Day 3 - thus only blocking out 2 days on calendar. 

 

Through trial and error, I played with a formula in the End Date in Flow using + # and - # to determine that [End Date] - 31 somehow works (for the most part)... that is very strange.  But if the All Day Event column was available to just enter YES, I believe it would come in as 3 day event.

 

Thanks,

Bill C

Categories:
I have the same question (0)
  • Argas Profile Picture
    31 on at

    I need the same thing

    I cannot find the way to set the all day event in the calendar item in sharepoint

    thanks

    Arturo

  • pbenati Profile Picture
    27 on at

    I'm having the same issues.  Any updates on this?  Thanks!

  • medasbabu Profile Picture
    29 on at

    I'm also looking for the same option, how to add a calendar event as an all-day event.

  • PHemingway610 Profile Picture
    129 on at

    I also need to be able to set the all day event field in Flow/Power Automate.  When copying calendar items between two SharePoint calendars, all day events go into the destination calendar offset by UTC so in the Eastern time zone, all day events are copied to the destination calendar spanning two days with start times of 7:00 PM the day before the event until 7:00 PM on the day of the event.  I could probably correct this in Flow if I could manipulate the all day event field (then update the start and end times to account for UTC offset).  Highly frustrating!

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Forum hierarchy changes are complete!

In our never-ending quest to improve we are simplifying the forum hierarchy…

Kudos to our 2025 Community Spotlight Honorees

Congratulations to our 2025 community superstars!

Leaderboard > Power Automate

#1
trice602 Profile Picture

trice602 237 Super User 2026 Season 1

#2
David_MA Profile Picture

David_MA 176 Super User 2026 Season 1

#3
Power Platform 1919 Profile Picture

Power Platform 1919 96 Super User 2026 Season 1

Last 30 days Overall leaderboard