Hi,
I had an idea of building generic flow for alerting failed flow-runs.
I identified that the definition of a flow is kept in CDS as a "Process" entity (name: workflow) but I was unable to find out where information about flow execution is stored.
Is it possible to get failed flow-runs with the date and flow name in Power Automate?