Hello
I'm having this intermittent issue with flows randomly failing because dates are not being pulled from excel every time, despite them being present in the excel table.
My final step of the flow sends an email that contains a date from excel, which i've formatted using an expression, but in the failed cases the email doesn't send because it doesn't recognise a date. When i view the 'get a row' on the failed flows, the dates are missing, despite them being on the excel.
4 days ago, there were multiple times this flow ran and worked perfectly, recognising the dates from excel, then today the flow has failed twice, with absolutely no changes made to the flow in between. The process is EXACTLY the same, but one day it works and the next day it fails. I've tried resubmitting the failed flows, making sure the dates are populated on excel (which they are) and i've tried re-adding in the expression to the email, and its still failing. This is the outputs of the get a row from a successful flow and failed flow that ran days apart. I cannot understand why one day the dates pull in and other days they don't.
Does anyone have any advice? is this a known issues? its really causing me a headache.
Thanks in advance
Sophie