Hi All,
I'm relatively new to Power Platform - and I'm struggling through configuring the CoE. I feel like I've hit a roadblock and I'm not sure if it's something I've done during the install, a mismatched version, perhaps a bug. As I said, I'm not sure if I have the experience in this product to discern between the two.
When I run the PowerBI desktop template, I get most of the data populated through, save the Environment Capcities. (Picture attached: BlankEnvironmentCapacity.jpg).
I assume that this is because the governance components haven't been setup yet. As I can see I've still got a fair bit to setup in the Setup Wizard.
But if I click on the Cimpliance process - I get a Missing Prerequisite which is the Admin | Sync Template v3 (Driver) flow. (Picture: AdminSyncTemplateMissing.png)
I can't seem to see this in the list of flows in the solution. I see other versions v3 and I'm sure when I was mucking around in a personal capacity I saw this. (Picture: ListOfFlows.png)
Can anyone shed any light on it? Happy if it's my fault and I've broken it, I'd just like to know what to do to fix it. Has anyone seen this before?
Thanks in advance,
Paul