I have a tracker I built in PQ, one of my columns is a calculated and it looks like my PQ editor gets stuck on that specific step and wont load past it. Is there a way to fix this?
mmbr1606
9
Super User 2025 Season 1
SD-13050734-0
6
Jon Unzueta
2