Hi all,
we are running several environments with power pipelines and we really like it as a base setup before moving to a more advanced devops solution.
However I was wondering how others use the scheduling, we have a solution structure based on 5-6 main solutions. And the schedule is really nice. However the bad thing is that PP will do a dependency check which will fail as there is a dependency in a solution that is scheduled to deploy before the next solution in line which makes the scheduling almost useless. 😞
An idea that would be nice would be to have in the last dependency check an ignore checkbox so you are able to schedule the deploy even though there is a dependency failure. However when that solution is ready to deploy the dependent objects will be in the environment due to a prior deployment,.
any thoughts or ideas?