Trying to solve a problem between new rows in Smartsheet (trigger) and a calendar event with Outlook (Create Event V4 - action). I have used an expression from this forum to generate 'start time' and 'end time' for the event, but cannot figure out how to incorporate a specific date into the expression. Here is what I used:
Hi, did you figure out how to do this? I'm looking to do something similar between smart sheets and outlook calendar. Thanks
Sorry or the delay, I have inserted the PARSE JSON trigger. However, when I test the flow, it does not succeed or fail. Just a spinning circle. Here is a screenshot of what I added.
Can you screenshot the PARSE JSON portion expanded?
@Ben77 from the json response that I use just add this response to the date of you event.
Forgive me, but not sure how to incorporate that into the CREATE EVENT (V4) - Outlook Calendar event. What you came up with looks like an individual action. I need the date to be apart of the event I have created already.
@Ben77 I try with an example I don't know if this is what you need.
So I write a row with a date in my SmartSheet and then that date I get to use it where I want.
Hope this can helps you.
I am hoping for the CREATE EVENT V4 action to grab a specific date from Smartsheet. The flow will successfully grab the 'start time' and 'end time' for the Outlook calendar, but will only fill it in with today's date. I need it to be date specific based on data from a column available in Smartsheet.
@Ben77 hi friend sorry I don't understant what you want, could you paste you compose answer and tell me what is the result you want.