hello all,
I have a SharePoint List which basically what it does is people assign things to be done to some other employees. the SharePoint List has 3 status options:
the idea is when they are completed the person who assigned the task to write an evaluation so I am trying to figure out the best way to do that:
the idea would be that there should be a link to the form generated when the item has status completed- whichever of the two options above - and then either:
so the thing are two with each one having their own questions:
any ideas?
WarrenBelz
791
Most Valuable Professional
MS.Ragavendar
410
Super User 2025 Season 2
mmbr1606
275
Super User 2025 Season 2