I have created solution, inside the solution I have added Canvas App, Power Automated Flow, some environment variable. I have used SharePoint list as my app data storage. Then I have created Power Bi report using the same SharePoint list and I have embedded the Power BI tile into the canvas app and TileUrl is linked with a Power BI report which uploaded in My WorkSpace and Dataset of this report in connect with a SharePoint List.
Now I want to move this solution into another Prod environment, What should I do now?
Should I add power BI report and dataset into my solution?
Please let me know the best way to migrate it into the production?
Thanks in advance