Hi all,
I have a flow with a set of parallel actions, I would like to add another action to the set of branches, but the option is not visible.
In this flow there are 2 parallel processes, the second one is nested in the first one, I can add a branch to the first one, but not to the second one.
Is this a bug, or is there a way to achieve this? It was working when I built the flow months ago.
I've attached a GIF of it.
