I am on section 4. Configure a model driven app on the Plan Designer track.
I followed the step to create the model-driven app from the technologies section of my plan, and now "Getting Things Ready" has been getting ready for a couple of hours.
I've searched the web - done the all the steps (clear cache, reset, etc. etc)
What is the workaround for this? Is this standard that creating apps from the Plan Designer may take this amount of time? This is the second day that the Things that were supposed to be Getting Ready were never produced.
Should I create a model driven app and then add the tables after? Instead of creating the App from the Plan Designer?
Additionally, would anyone like to link up and create a group for the new Power Apps course? All of the help topics available do not point to the lessons I have been doing since December 2025.
Thanks!
Gigi