Hello, I created a simple flow that will take data from an Excel table, plug it into a SharePoint doc, and then create a new copy of the doc per row in the table.
Everything plugs in fine except a field that is supposed to plug in a date. The date for example should be 7/14/2023, however, when it comes out in the Word doc, it is 45121. I can't fathom why it would come out as this. It did this for a couple dozen documents and they're all random numbers. Can someone help me figure out why this might be happening?
Thanks!

Report
All responses (
Answers (