Hi, I'm not sure I'm choosing the right location for this question, but please redirect me if it's not.
We're building a model-driven app, and want to move the business process flow forward to the next stage when an assignment is made (i.e., when the owner changes). I've been able to make this work using this process:
How to change BPF stages automatically using workflow in Dynamics 365 – Dynamics 365 CE/Power Platform, PowerApps, Power Automate, Azure by Vishal Grade
But, it uses the Process (Workflow) and I think that method is being deprecated? There is a message at the top of the Process edit page to use Microsoft Flow instead. I'm somewhat familiar with Flow, but I don't think I can recreate this Process in Flow?
Can anyone advise on the currently recommended way to do this? Can I do it in Flow and I'm just being clueless? 🙂