Hi There,
I have a flow that uses Encodian Parse CSV then Parse JSON and then Sharepoint Create Item to add this to a list.
The Parse JSON ouotputs a date field in the CSV as String in the format "DD/MM/YYYY" and the Create Item is failing as it is reading the string in the format "MM/DD/YYYY"
I can see two possible options.
1. Change the Create Item so that it accepts the date in "DD/MM/YYYY" format. Not sure if this is even possible.
2. Convert the input string to "MM/DD/YYYY" but I have no idea how this could be done as it is literally a text string so has no concept of it being a date.
Thanks for any advice.