Hi,
I would like to ask about the the power automate trigger issue
The work flow is once I create a new leave from leave application, the work flow will get items of leave summary with filter query by user, leave type and year, then will add the "number of days" to "leave pending approval".
But if I add multiple leave to the list in the short time interval (maybe between 15 seconds), the system will trigger in the same time, so the data will occur error.
For example, I add a 2 days annual leave in a request and another request is 1 day annual leave. For normal flow, the "leave pending approval" will be 3, the first trigger is add 2 to "leave pending approval", the second trigger will get the updated data and add 1, so will be 3. But if I add multiple leave in short time interval, the system will trigger in the same time, and the final result will be the last trigger flow result, continue with the example above, first trigger is 2 and second trigger is 1, the final result will be 1.
So if I add multiple leave with long time interval, there has no problem, and I should wait awhile after create a leave, it will take it long time to do. This also happen in other workflow.
Is anyone happened this and can help me to solve?
a very thank you in advance.