Hi all,
I am running a Power Bi dashboard and would like to post a message in a Teams channel when the dashboard is refreshed (currently using a scheduled refresh). Unfortunately Power Bi itself only sends an e-mail if the refresh failed. So my idea was to work around that to check every morning if that e-mail of the failed refresh did arrive and if it did not, then to post a teams message that the data was updated.
In MS Flow I cannot find a proper item to do that. My idea was to use the scheduled flow but then I am failing to find an item for Outlook 365 to look for an e-mail.
Does anyone else have built something similar that could be shared? Or is there another idea how to do this conditional post in Teams?