Hi.
I created a flow that insert a new element in a Sharepoint list.
As this element has to be referenced (example : TOPIC-YYYY-Number), I read another list that contains the last number, add 1 to this number which becomes the new number in the new reference created.
Lately, I had a problem with 2 executions in parallel of this flow which retrieve the same number. Meaning, they were triggered simultaneously.
I found a tip that is awesome : "if you want a flow to only trigger one run at a time, one after another, then you can go into the 1st action, the trigger action, settings and use the Concurrency Control limit to limit the flow to only doing 1 run at a time".
BUT, In my flow I have a approbation by the manager to run, so I can't wait till one manager to process and have the others wait.
SO I can't use this setting for my flow...
Does anybody has a solution please ?
Thanks.
Michele.

Report
All responses (
Answers (