Hi
I have a flow where a new response from an MS Form is added to an excel spreadsheet. One field in the excel is a date field and i am looking to get the date the form was submitted. In the format dd/mm/yyyy
I have added 2 actions:
Current time
Convert time zone:

And on the Add a row into a table, the Date Submitted field has the dynamic content from the convert time zone action.
However, when the flow is run, the date is coming out wrong:

I'm guessing it is assuming the mm is the minutes and not the month. How can i fix this so it would display 03 instead of 46?
thanks