I am trying to have a flow run to add a date in Sharepoint columns based on the value of a choice column ("Gate"). "Gate" will change as a project goes through a process and I'd like to document the date of each stage. I cannot get the date to be specific to the gate value. When the flow runs it puts the same value in all 3 date columns.
I followed these steps (as found in other questions), but I think I am maybe missing something in the "Yes" or "No" to look at the Gate choice value. Flow when a SharePoint Column is updated - @WonderLaura
Gate Result:
A Put the date Gate A was selected and have the dates of B and C empty
B Keep the date of Gate A in a column and put the date Gate B was selected in a new column and have the dates of C empty
C Keep the date of Gates A and B in their column and put the date Gate C was selected in a new column