I am brand new to Power Automate. I have a flow set up to create planner tasks from a SharePoint list that logs new referrals. We have 4 teams that complete the tasks.
I need help creating a flow that will assign the tasks to each team based on a rotation (ie: team 1, team 2, etc). I have tried using an excel table that updates each time a task is created. However new items are put into the SharePoint list rapidly and the flow cannot keep up so it ends up skipping the rotation and/or creating multiple copies of the planner tasks. Does anyone know a better way to assign tasks based on a rotation and/or how to speed up the flow so it does not skip the rotation?