Hi,
I have a flow that is scheduled to run each month and then it creates an email that includes a link to a sharepoint folder, however this process works a month behind so for January 2023, the email needs to say 2022_12 instead of 2023_01.
I am able to get the prior month but am having trouble getting the previous year if the current month is January.