Hello everyone,
I have two sharepoint lists.
The first sharepoint list contains the forklifts that we have for testing. Each forklift has its own ID, which was automatically generated by adding it to the sharepoint list.
In the second list, the checks for the respective forklifts are recorded. This means that the employee knows exactly what he has to do when he checks the forklifts weekly, monthly or annually.
I have made two views in Powerapps. On the left-hand side, you can see the assets. If you click on the button, it shows the respective maintenance steps on the right-hand side. The employee can then click on the work when he has completed it. Then the completed checks are recorded in tbl_checks including date and time.
I would like to display the corresponding completion date of the work in the APP for the respective forklift.
For example.
ID1 forklift last inspection made on 09.01.2024
ID2 Forklift last inspection on 20.01.2024 and so on.