Hi,
I could not understand the bellow diagram, in image two the base solution is not in the diagram but its mentioned that is happening a patch operation, maybe it was an error in image diagram?
https://www.d365implementationguide.com/books/asvr/#p=298
Image 1
Image 2
The image is pretty straightforward to me. In the first image you are importing a managed solution into production. In the second image you are impoting a patch into production. The image shows that the patch sits as a managed solution layer on top of the existing 1.0.0.0 managed solution. So I'm not sure what you mean by the base solution. The base solution would be the 1.0,0,0 managed solution.
@marde I think you're referring to the absence of the base unmanaged solution A in the second image in Development environments 1 and 2? If this is the case, I agree with you, I think this is an error
Under review
Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.
Congratulations to our community stars!
Expanding mentorship, skilling, and AI innovation
These are the community rock stars!
Stay up to date on forum activity by subscribing.
11manish 236 Super User 2026 Season 2
WarrenBelz 188 Most Valuable Professional
Mohsin Ali 130