My issues is when I move back the task to state doing (not longer in state=done) for an update in DevOps, I want the matching item that has been created in the SharePoint to be removed.
The first flow works perfectly(create an item in SharePoint) but the second flow (to remove the item when an item change the state )doesn't work or I don't know how the flow should be?