Hello,
I have an approval workflow that once approved the flow populates the response date into a field with in my model driven app.
In the workflow I have the response date converted from UTC to cst 01/01/2020.
However when the date gets to the field in Power Apps it displays 1 day behind. I can see in the flow that the output is the correct date but the date doesn't populate correctly in the powerapps field.
I have not found an answer to why this is working this way. Anyone with any ideas?
Thanks
Mel