I'm hoping someone might be able to help me.
I currently have a flow that sends a daily summary of task assigned to a bucket. Everything works fine, until I have different dates assigned on to a planner card. Normally it is not an issue, since everyone on the card gets assigned at the same time during a separate automation process to 3 individuals. But recently, we have needed to remove one of the assignees and add another. So now, the planner card for example will have 2 people with an assigned date of 1/5/2024 and another will have it as 1/25/2024. I need to retrieve the singular oldest date (1/5/2024) that it has been assigned to the team as a whole. This date is then used in a separate part of the flow as a function to calculate the date difference between today and the date assigned. Any ideas? Thanks for any help.