Hi Guys:
1. I have a flow like below picture, I have set the the Feasibility Review QA will time out if no one response with in 2 minutes;

2. After Feasibility Study Review QA is time out, the flow will stop and won't go to step 2 when I use "Terminate", what action can be used to replace "Terminate" if I want the flow will continue running to Step2 when QA is time out?
