Hi, new to flows and struggling to achieve what i want. A lot of it is probably not understanding the format.
I am trying to create a flow that when a new SP list item is created that it creates an event in my O365 calendar, using the due date from the item.
When creating it the end time is before the start time which I find odd, but I am entering dynamic data from the item called due date. Ive tried adding times to this but possibly using the wrong syntax.
The best I can do at the moment is get it to create an event of a half hour time slot starting at the nearest 30 minutes after the item is created. e.g. I may create a new item at 7:40 on the 16th, but the due date is the 17th. This creates a 30 minute event on the 16th from 8:00.
What I want to achieve is allocate a 1 hour time slot on the actual due date at 9AM, I don't require any further flexibility than that.
Any help appreciated.