Hi.
I have been tasked with making a scheduled flow. This flow will run each day at 9am.
I have a sharepoint list, with a column called 'Review date'. I want to make it so that the email reminder will include all items with a review date within the next 5 days.
For example, we have 3 items, one with an RD on the 31st March, two with an RD on the 1st April, and three with an RD on the 2nd April.
If the flow were to run today, it'll show; Item 1: Name, ID, review date, Link. (Same for item 2 and 3).
Is a scheduled flow like this possible?
Thank you for your help in advance.