Uploaded a screen of my flow.
I actually thought i could decide my own variable data storage, so all are text.
Some are genereated by calculations using variables in flow
Some are generated using compose and a filter from get items sharepoint list.
I do get a result posted to Teams that is my test
the error comes in powerapps
No data is collected from powerapps, only from my sharepoint lists.
Flow is getting called in the logs.
Something that worries me is that the error message from flow talks about an error because a timelimit.
Uploaded a picture on it, even tho it is only in swedish:S
Can the flow be to long/large and take to much time to run for powerapps?
I found this: https://powerusers.microsoft.com/t5/Building-PowerApps-Formerly/Respond-to-PowerApps-Timeout/td-p/345535
My flow takes 4-5 mins to run. So this will not work?
Seems so much work to do a few calculations on a large data set.... Now i need to create a new sharepoint list and store the result in that one instead of sending to powerapps and then bring in the result to powerapps from a datasource?